Passivhaus Consultant and Designer, Bristol.  Very Low Energy Buildings.  Domestic and non-domestic.  New build and refurbishment. 

07502 425158
piers@piers-sadler.co.uk

Bristol, UK

« Passivhaus design | Main | GreenFit eco:refurbishment service launched »
Wednesday
Apr062011

Contaminated land risk assessment review

I have been appointed to provide high level review and technical advice to an international engineering and environmental consultancy on a complex contaminated land risk assessment.  The site is a former colliery spoil heap with a number of tar lagoons on it.   I have reviewed the available information and risk assessments and assisted in developing a case to present to the EA to support proposed remediation targets.  I provided support to the conceptual model and quantitative risk assessment by drawing additional interpretation from the contaminant distributions and site hydrogeology and hydrochemistry.  EA negotiations continue.

Reader Comments

There are no comments for this journal entry. To create a new comment, use the form below.

PostPost a New Comment

Enter your information below to add a new comment.

My response is on my own website »
Author Email (optional):
Author URL (optional):
Post:
 
All HTML will be escaped. Hyperlinks will be created for URLs automatically.